30 overnight. Sunny and low 40s today. Not much tree activity. We need colder weather.

Into the woods by 6:00 AM to cook. By the time we assembled the pipes from the tanks and completed other preparation, it was 7:00 AM before we started the fire. Had a boil by 7:45 AM.

The day cooking

7:00 AM 13 1/3”
9:00 AM 10 ¾”
10:00 AM 9 ¼”
11:00 AM 7 ½”
12:00 PM 5 ¼”
1:00 PM 3 ½”
2:00 PM 1 ¼ “
2:30 PM Done

No batches into the milk can.

1st Boil Feb 19, 2026
1st boil Feb 19, 2026

We did not use the R/O. We’ve learned over the years that trying to prep the membrane while cooking is a frustrating experience. Your attention is split between cooking and the R/O and neither is done well.

A grate in the firebox broke. We had to adjust firing on the fly since we had a fire going. Used scrap metal to replaced the grate. We’ll adjust the spacing on the remaining grates to compensate for the missing grate. Hope we make it through the season.

Broken Grate on Evaporator
Broken grate from evaporator firebox